BECO provides appropriate energy system design and consultation services. Find out how to become energy independent click here.
I bought a small farm back in 98'. Currently I care for several horses from the grasses that grow on the property. A wind water pump tower is still on the home site. If I disconnect the pump rod from the pump the wind blades will power the rod. Could I convert this wind mill from water pumping to electric production just by attaching a generator to the pump rod? Robert
- warning: Parameter 2 to securepages_link_alter() expected to be a reference, value given in /home1/progres1/public_html/includes/common.inc on line 2839.
- warning: Parameter 2 to securepages_link_alter() expected to be a reference, value given in /home1/progres1/public_html/includes/common.inc on line 2839.
- strict warning: Non-static method view::load() should not be called statically in /home1/progres1/public_html/sites/all/modules/views/views.module on line 879.
- strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home1/progres1/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
- strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home1/progres1/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
- strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home1/progres1/public_html/sites/all/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 0.
- strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home1/progres1/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
- strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home1/progres1/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
Robert,The wind pumping systems designed from earlier times are designed for power not speed. The multi blade wind catcher along with a lubricated gear box assured water will be pumped. To generate electric power from wind will require speed. The only part of the old wind mill that is of use will be the tower. Depending on the height of the tower and the number and size of the surrounding obstacles that may block a smooth wind flow the tower could nest a wind turbine. I'm located in Minnesota. For the price to cover transportation expenses I'd be glad to come out to access your wind potentials.
Ask a Question
about appropriate energy and BECO will try to answer it. And check out our Frequently Asked Questions
about appropriate energy and BECO will try to answer it. And check out our Frequently Asked Questions
Subscribe
Advertisement
- Please visit:
- Kansas Wind Power - Alternative Energy Supplies and Equipment.